Skip to main content

Drainage Engineering in Miami-Dade County

Miami-Dade County property owners face specific drainage and stormwater requirements governed by the South Florida Water Management District (SFWMD). CivilSmart's Licensed Professional Engineers provide PE-stamped drainage plans, stormwater management designs, and full permit coordination for residential and commercial projects throughout Miami-Dade County.

1,000+ Projects 100% Permit Approval Since 2004

Our Engineering Services in Miami-Dade County

Licensed Professional Engineers delivering PE-stamped drainage designs, stormwater management, and permit services.

Residential Drainage Design

PE-stamped drainage plans for Miami-Dade County homes. Yard flooding, pool drainage, grading permits, and stormwater management for residential properties.

Learn More

Commercial Stormwater

Commercial stormwater management for Miami-Dade County developments. Site plans, detention/retention design, and SFWMD ERP compliance.

Learn More

Permit Services

Full drainage permit management for Miami-Dade County. SFWMD ERP applications, iBuildMiami (miamidade.gov/permits) coordination, and local permit processing.

Learn More

Drainage Challenges in Miami-Dade County

Miami-Dade County operates one of Florida's most complex drainage regulatory frameworks. Chapter 24 of the Environmental Protection Code governs stormwater management, with size-based permitting that routes smaller projects through Plan Review and larger ones through the Water Control Section. The county's flat topography, high water table, and coastal vulnerability to sea-level rise make engineered drainage solutions critical for every development project.

Triple-layer compliance

Miami-Dade County code (Chapter 24) + SFWMD ERP + city-specific requirements create one of Florida's highest-complexity jurisdictions for drainage permitting.

Sea-level rise and king tide impacts

Miami-Dade's coastal drainage challenges are nationally recognized — engineered solutions must account for rising groundwater and king tide flooding events.

Urban density challenges

Limited space for surface-level stormwater systems drives demand for underground detention, exfiltration trenches, and innovative below-grade stormwater management.

North Trail Basin Stormwater Compensation Trust Fund

This unique financial mechanism allows stormwater compensation payments in lieu of on-site treatment in the North Trail Basin area.

Key Requirements

  • Chapter 24 Environmental Protection Code
  • Stormwater Compensation Trust Fund (North Trail Basin substitution)
  • Recertification per Section 24-21.1
  • iBuildMiami portal

Miami-Dade County Drainage Regulations

Governed by the South Florida Water Management District (SFWMD)

Permit Thresholds

< 2 acres: Plan Review Section ($300 res/$475 comm). 2+ acres: Water Control Section ($260+$50/acre).

Local Stormwater Ordinance

Miami-Dade County enforces its own stormwater ordinance with requirements that may exceed SFWMD minimums. Projects must comply with both local and district standards.

Chapter 24 Environmental Protection Code

Chapter 24 Environmental Protection Code

Stormwater Compensation Trust Fund

Stormwater Compensation Trust Fund (North Trail Basin substitution)

Recertification per Section 24-21.1

Recertification per Section 24-21.1

iBuildMiami portal

iBuildMiami portal

Design Storm

25-year, 3-day rainfall

Retention Standard

< 2 acres: Plan Review Section ($300 res/$475 comm). 2+ acres: Water Control Section ($260+$50/acre).

Permit Portal

iBuildMiami (miamidade.gov/permits)

Special Requirements

  • Chapter 24 Environmental Protection Code
  • Stormwater Compensation Trust Fund (North Trail Basin substitution)
  • Recertification per Section 24-21.1
  • iBuildMiami portal

How We Work in Miami-Dade County

1

Contact & Consult

Describe your Miami-Dade County drainage challenge. We assess your situation and outline the engineering approach.

2

Site Assessment

We evaluate your property, review existing conditions, survey elevations, and identify regulatory requirements.

3

Design & Engineering

Our licensed professional engineer creates SFWMD-compliant drainage plans, PE-stamped and ready for permit submission.

4

Permit & Approval

We submit to SFWMD and Miami-Dade County, manage revisions, and deliver your approved drainage permit.

We engineer the solution — you get the approved permit.

Get Your Free Miami-Dade County Drainage Quote

Leave your details and we'll reach out within 24 hours.

24-hour response guarantee. No obligation.

Miami-Dade County Drainage Engineering FAQ

Yes, Miami-Dade County requires drainage plans for development and redevelopment projects. Miami-Dade County falls under the South Florida Water Management District (SFWMD), which administers Environmental Resource Permits (ERPs) for projects exceeding general permit thresholds. A Licensed Professional Engineer must prepare and seal drainage designs for permit submission. Permits can be submitted through iBuildMiami (miamidade.gov/permits). CivilSmart handles the entire permitting process from design through approval.
Residential drainage design in Miami-Dade County typically ranges from $3,000–$8,000 for standard properties, with complex projects (flood zones, retention/detention systems, large lots) ranging from $5,000–$15,000+. Commercial stormwater management starts at $10,000 and scales with project complexity. Every CivilSmart project begins with a free custom quote based on your specific property and regulatory requirements.
Miami-Dade County drainage projects must comply with SFWMD Environmental Resource Permit (ERP) requirements under Chapter 62-330, F.A.C. Additionally, Miami-Dade County enforces its own local stormwater ordinance that may impose stricter requirements than state minimums. Key local requirements include: Chapter 24 Environmental Protection Code; Stormwater Compensation Trust Fund (North Trail Basin substitution). CivilSmart's engineers are experienced with all applicable Miami-Dade County regulations.

Cities We Serve in Miami-Dade County

CivilSmart provides drainage engineering across Miami-Dade County, including the following cities and communities.

Ready to Solve Your Miami-Dade County Drainage Problem?

Get a free quote from Florida's drainage engineering specialists. PE-stamped plans, full permit coordination, and 100% approval rate.

Licensed Professional Engineers | 1,000+ Projects | 100% Permit Approval | Since 2004