Skip to main content

Drainage Engineering in Pinellas County

Pinellas County property owners face specific drainage and stormwater requirements governed by the Southwest Florida Water Management District (SWFWMD). CivilSmart's Licensed Professional Engineers provide PE-stamped drainage plans, stormwater management designs, and full permit coordination for residential and commercial projects throughout Pinellas County.

1,000+ Projects 100% Permit Approval Since 2004

Our Engineering Services in Pinellas County

Licensed Professional Engineers delivering PE-stamped drainage designs, stormwater management, and permit services.

Residential Drainage Design

PE-stamped drainage plans for Pinellas County homes. Yard flooding, pool drainage, grading permits, and stormwater management for residential properties.

Learn More

Commercial Stormwater

Commercial stormwater management for Pinellas County developments. Site plans, detention/retention design, and SWFWMD ERP compliance.

Learn More

Permit Services

Full drainage permit management for Pinellas County. SWFWMD ERP applications, pinellas.gov coordination, and local permit processing.

Learn More

Drainage Challenges in Pinellas County

Pinellas County enacted Florida's first stormwater ordinance in 1970 (Code Sec. 73-7) and enforces the state's strictest local standard: zero net runoff increase. Any development must fully offset its drainage impact. As the most densely populated county in Florida, stormwater engineering in compact urban spaces is the norm, not the exception. Over 55 years of stormwater regulation means mature enforcement and detailed technical expectations.

Zero net runoff increase

Pinellas's "no net increase in runoff" standard is the strictest local standard in Florida — any development must fully offset its drainage impact.

Most urbanized county

Pinellas has the highest population density in Florida — stormwater engineering in compact spaces is routine, requiring creative design solutions.

Oldest stormwater regulation history

55+ years of regulation (since 1970) means mature enforcement, detailed technical expectations, and no shortcuts in the permit process.

Clearwater AAA-rated stormwater bonds

Fitch June 2025 rating shows serious institutional investment in stormwater infrastructure — the regulatory environment is sophisticated and well-resourced.

Key Requirements

  • Oldest FL stormwater ordinance (1970, Code Sec. 73-7)
  • Zero net runoff increase standard
  • PE-prepared site plan required
  • Habitat Permit for tree removal

Pinellas County Drainage Regulations

Governed by the Southwest Florida Water Management District (SWFWMD)

Permit Thresholds

No net increase in runoff. 25/50/100-year storm detention. First 1/2 to 3/4 inch retention.

Local Stormwater Ordinance

Pinellas County enforces its own stormwater ordinance with requirements that may exceed SWFWMD minimums. Projects must comply with both local and district standards.

Oldest FL stormwater ordinance

Oldest FL stormwater ordinance (1970, Code Sec. 73-7)

Zero net runoff increase standard

Zero net runoff increase standard

PE-prepared site plan required

PE-prepared site plan required

Habitat Permit for tree removal

Habitat Permit for tree removal

Design Storm

25-year, 24-hour (open basins); 100-year, 24-hour (closed basins)

Retention Standard

No net increase in runoff. 25/50/100-year storm detention. First 1/2 to 3/4 inch retention.

Permit Portal

pinellas.gov

Special Requirements

  • Oldest FL stormwater ordinance (1970, Code Sec. 73-7)
  • Zero net runoff increase standard
  • PE-prepared site plan required
  • Habitat Permit for tree removal

How We Work in Pinellas County

1

Contact & Consult

Describe your Pinellas County drainage challenge. We assess your situation and outline the engineering approach.

2

Site Assessment

We evaluate your property, review existing conditions, survey elevations, and identify regulatory requirements.

3

Design & Engineering

Our licensed professional engineer creates SWFWMD-compliant drainage plans, PE-stamped and ready for permit submission.

4

Permit & Approval

We submit to SWFWMD and Pinellas County, manage revisions, and deliver your approved drainage permit.

We engineer the solution — you get the approved permit.

Get Your Free Pinellas County Drainage Quote

Leave your details and we'll reach out within 24 hours.

24-hour response guarantee. No obligation.

Pinellas County Drainage Engineering FAQ

Yes, Pinellas County requires drainage plans for development and redevelopment projects. Pinellas County falls under the Southwest Florida Water Management District (SWFWMD), which administers Environmental Resource Permits (ERPs) for projects exceeding general permit thresholds. A Licensed Professional Engineer must prepare and seal drainage designs for permit submission. Permits can be submitted through pinellas.gov. CivilSmart handles the entire permitting process from design through approval.
Residential drainage design in Pinellas County typically ranges from $3,000–$8,000 for standard properties, with complex projects (flood zones, retention/detention systems, large lots) ranging from $5,000–$15,000+. Commercial stormwater management starts at $10,000 and scales with project complexity. Every CivilSmart project begins with a free custom quote based on your specific property and regulatory requirements.
Pinellas County drainage projects must comply with SWFWMD Environmental Resource Permit (ERP) requirements under Chapter 62-330, F.A.C. Additionally, Pinellas County enforces its own local stormwater ordinance that may impose stricter requirements than state minimums. Key local requirements include: Oldest FL stormwater ordinance (1970, Code Sec. 73-7); Zero net runoff increase standard. CivilSmart's engineers are experienced with all applicable Pinellas County regulations.

Cities We Serve in Pinellas County

CivilSmart provides drainage engineering across Pinellas County, including the following cities and communities.

Ready to Solve Your Pinellas County Drainage Problem?

Get a free quote from Florida's drainage engineering specialists. PE-stamped plans, full permit coordination, and 100% approval rate.

Licensed Professional Engineers | 1,000+ Projects | 100% Permit Approval | Since 2004